It's time to get crazy!

Here is the fist page of many to come. Please let me introduce the
Heath and Jerry Project Page. We have taken on the duty of building not one but two
airplanes at the same time. These aircraft come from Zenith product line. You can visit
there web site at http://zenithair.com.

Jerry will be building the 701 (STOL) and I will be working on the 601 (XL)
Both aircraft will be built in one garage with one goal in mind; Two top of
the line aircraft that will set a record for excellence.
The names of our new birds:
Heath (N601XC)
Jerry  (N701XC)

I am proud to be working with Jerry on this endeavor and feel we will make a good team.
To kick this project off we had to prepare for pick up and storage. This is an entire project in
itself. Here are some photos of getting the box ready. We had already spent a lot of time
building shelves and tables but it gives you an idea of where we stand. Wish us luck...
DATE 8-28-04

Use the links below to see the progress

Opening Page Index
Time to Travel 9-11-04
Breaking Ground 9-18-04
Tail Section 9-21-04
701 Tail Construction 10-19-04
601 Tail Construction 10-23-04
601 Tail Continued 10-31-04
701 Wing Construction 10-31-04
601 Tail Finished 11-13-04
601 FLaps 11-20-04
701 Wing Construction Continued 12-05-04
601 Ailerons 12-05-04
 601 Panel 12-29-04
601 Right Wing 1-9-05
601 Right Wing Continued 1-22-05
601 Wing Nose Skin 1-30-05
601 Wing Fuel Pumps
601 Closing the Bottom Wing 2-10-05
701 Right Wing Finished 1-15-05
601 Nose Skin 2-12-05
601 Right Wing Closed 2-19-05
601 Right Wing Final Touches and Wing Tip 2-22-05
601 Panel Continued 3-01-05
601 Left Wing 3-12-05
701 Left Wing 3-12-05
701 Fuselage Start 3-19-05
601 Left Wing Continued 3-26-05
701 Fuselage Progress 3-26-05
601 Left Wing Closed 4-1-05
601 Left Wing Finished 4-10-05
701 Fuselage Baggage Compartment 4-10-05
601 Fuselage Start 4-13-05
701 Tail Mounting to Fuselage 4-13-05
601 Fuselage Continued 4-23-05
701 Cabin Started 4-23-05
601 Engine Delivered 4-27-05
601 Gear Channel 5-3-05
601 Fire Wall and Floor Pan 5-6-05
601 Longerons and Engine Mount 5-7-05
601 Side Skins and Bulkheads 5-14-05
601 Wing Jigs 6-25-05
701 Front Fuselage 6-25-05
601 Baggage Panel 7-30-05
701 Controls 7-30-05
601 Seats, Console, and Alodine. 8-20-05 and 9-10-05 One Year Progress
701 on the Gear. 9-10-05 One Year Progress
601 Flap Controls 10-15-05
701 Engine and Cowl 10-15-05
701 Mock Up 10-30-05
601 Baggage Panel 11-05-05
601 Nose Gear and Fairleads 12-30-05
601 Fuselage Photos 1-31-06
601 On the Gear 2-2-06
701 Ready to Prime and Dash 2-2-06
601 Canopy 3-28-06
701 Dash Continued 3-28-06
601 Jabiru Time 5-6-06
701 Ready to Paint 5-6-06
601 Jabiru Continued 5-14-06
601 Cowl 6-6-06
601 Mock Up 7-16-06
701 Interior 7-16-06
Hanger Time 7-29-06
701 Completed 9-17-06
601 Paint Stage 10-15-06
601 Dash and Hanger 10-30-06
601 Fuselage and Bubble 12-17-06
601 All closed in 01-12-07
601 Spinner 3-22-07
601 Nice Day 5-19-07


       

      

      

      
 